Corporate Overview
Experience Profile
Services
Corporate Overview
Through three generations of family leadership, the Dimeo organization has successfully nurtured and grown a corporate culture anchored to service, transparency, quality, and superior value. Our Philosophy Builds Success
Steve Rutledge President & CEO
Christopher Doepper Executive Vice President & COO
Brad Dimeo Chairman
Today, the company is led by Stephen F. Rutledge, President & CEO, Bradford S. Dimeo, Chairman and Chris Doepper, Executive Vice President & COO. This leadership team works with our clients and project teams to ensure complete customer satisfaction. At Dimeo, we place significant emphasis on assuring strong team alignment on every project we plan and build.
O We develop and nurture team relationships and collaborations that result in constructing buildings that exceed our clients’ expectations. Brad Dimeo, Chairman
30
ASH
Dimeo Construction Company 4
Our Resources and Market Position
sub contractors >6000 9 DECADES serving clients OSHA BEST IN NATION inspection record among
$ S/W/MBE contracts 1.5 BILLION 265 + PROFESSIONALS average longevity 15+ years
.55 EMR
ranked CM AT RISK ENR TOP
BILLION $1 bonding financial strengths
$2.7 BILLION LEAN assignments
CMAR >85% 8 BIM/VDC experts
preconstruction ANNUALLY $4 BILLION
5 K-12
Experience Profile
New Construction // Stamford, CT Size: 400,000 sf // Architect: The S/L/A/M Collaborative, Amenta Emma Westhill High School
The new Westhill High School delivers an energy-efficient facility that improves traffic circulation, enhances the educational environment, and supports the surrounding community. Site features include two synthetic turf fields, a natural grass baseball field, a softball field, and tennis courts. The existing high school, occupied during construction, will be demolished upon completion of the new building.
7 K-12
New Construction // Cranston, RI Size: 85,000 sf // Architect: Fielding International Garden City Elementary School
Garden City Elementary School will comply with 21st-century learning needs and meet current educational program requirements for grades K-5. The new facility provides a variety of learning and community engagement spaces, including a cafeteria, gymnasium, and performance areas. Demolition of the existing +/- 33,000 sf building was followed by construction of a new 85,000 sf elementary school on the existing site with a maximum capacity of 575 students. Site improvements included student bus and parent drop-off areas, additional parking, new play structures, outdoor learning areas, and plantings. Gas and electrical services were upgraded with a new generator, and sub-surface and surface stormwater infiltration systems were incorporated to meet or exceed current sustainability and energy codes.
Dimeo Construction Company 8
9 K-12
New Construction // Warwick, RI Size: 200,000 sf // Architect: SA Architects, JCJ Architecture Toll Gate High School
Toll Gate High School was designed to serve 1,170 students in a facility built around modern learning and community connection. The school includes classrooms, labs, learning studios, CTE workshops, and student commons, as well as a gymnasium, auditorium, dining commons, and media center. Key shared spaces were designed with the broader community in mind, creating opportunities for engagement beyond the school day.
Dimeo Construction Company 10
New Construction // Warwick, RI Size: 206,000 sf // Architect: Saam Architecture Pilgrim High School
Pilgrim High School was designed to support 21st-century learning and reflect the District’s goals for an equitable, flexible, and community-centered facility. Classrooms are organized within non departmentalized learning communities, encouraging cross-curricular collaboration by integrating Career and Technical Education, vocational and technical programs, health, arts, and core academics. Large common spaces, including a double-height dining and learning commons, serve as the building’s central spine, connecting students across activities and providing clear wayfinding throughout. Simplified and standardized materials support long-term sustainability and reduce maintenance costs.
11 K-12
New Construction // Providence, RI Size: 78,000 sf // Architect: StudioJAED Harry Kizirian Elementary School
Kizirian PK-8 School is a new, purpose-built facility replacing the former elementary school on the same grounds. The building is designed to serve approximately 858 students across pre kindergarten through eighth grade, with three classrooms per grade. Accessible and inclusive by design, the facility includes separate bathrooms and learning areas for the youngest and oldest students, as well as updated technology and safety features throughout.
Dimeo Construction Company 12
Early Childhood Building // Providence, RI Size: 27,000 sf // Architect: SA Architects Meeting Street School
The two-story 27,000 +/- sf educational and administrative building sits on the pad north of the existing school and operational bus lane. This facility comprises six classrooms ranging from infants to preschool level, offices, and additional training/conference room spaces for Meeting Street faculty. The project also involved the renovation of the existing Early Childhood Center and Early Intervention space, approximately 9,000 sf on two different levels of the existing building, once the new Early Childhood Building is completed.
13 K-12
New Construction // Worcester, MA Size: 451,858 sf // Architect: LPA|A Doherty Memorial High School
Doherty Memorial is a 420,000+ sf building that serves grades 9-12, with an increased enrollment of 1670 students, and features a theater, an 800+ seat auditorium, and an 18,000 sf gymnasium. Featured programs at the high school include vocational technical courses such as programming and web development, construction craft laborer, and an Advanced Academy in both Biotechnology and Special Education. These programs are supported by additional STEM makerspaces, computer science classrooms, science labs, and Chapter 74 vocational spaces. The project followed the Green Worcester Plan to reach net-zero carbon emissions from city operations by 2050. Sustainable construction included 1,776 high-efficiency rooftop Vortex solar panels to create energy savings.
Dimeo Construction Company 14
New Construction, Occupied Campus // Duxbury, MA Size: 322,000 sf // Architect: Mount Vernon Group Architects Duxbury Middle - High School
The MSBA-funded co-located Middle and High School is part of the 65+ acre St. George Street campus and replaces both the existing Duxbury Middle and High Schools. The 322,000 sf, 1,700 student school includes a three-story High School wing that houses typical and specialized High School learning areas and High School administration; it also includes a three-story Middle School wing that houses Middle School administration and typical and specialized Middle School learning areas arranged in teams. This configuration allows for two teams per grade and one grade per floor, a spine concourse, and the one-, two-, and three-story “core plus” wing, which houses shared spaces for athletics, the arts, the cafeteria, and the media center. BIM was used to spatially coordinate MEP/FP systems to improve installation and reduce rework.
15 K-12
Fine Arts Center Expansion and Renovation // Newport, RI Size: 42,230 sf // Architect: Sasaki Associates, Inc. St. George’s School
This 42,230 sf project was designed to create a campus center in a space that originally housed the school gymnasium and locker facilities. The renovated and expanded building offers a formal exhibit gallery, a theater, dressing rooms, classrooms for drawing, painting, graphic arts, and photography, music rooms, a shop for welding, and woodworking.
Dimeo Construction Company 16
Fuller Athletic Center // Middlebury, CT Size: 34,000 sf // Architect: Graham Gund Architects Westover School
The 34,000 sf Fuller Athletic Center is a welcome and much-needed addition to the beautiful campus of Westover School, an independent college-preparatory and boarding day school for young women in grades nine through twelve. The center houses a gymnasium, a fitness center, a squash pavilion, a multi-purpose room, offices for the Athletic Director and Athletic Trainer, a locker room for students and faculty, a visiting team room, and equipment storage areas.
17 K-12
Jonathan E. Reed Elementary/Middle School // Waterbury, CT Size: 76,000 sf // Architect: Svigals + Partners, LLP Waterbury Schools
Jonathan Reed Elementary was built in memory of Reverend Jonathan E Reed, and is the first school in Waterbury named after an African American. This $31.5 million, 76,000 sf elementary/ middle school contains a two-story classroom wing with two classrooms per grade, special education rooms, art & science classrooms, and home resource rooms. The classroom wing also has a new media center and support space for school staff. The two-story open ceiling “cafetorium”, full-size gym, and athletic support spaces are located in an adjacent wing. Although not seeking LEED certification, the school achieved LEED Silver status. The completion of this project had a significant social and economic impact on the City of Waterbury, instilling pride and excitement in the surrounding community.
Dimeo Construction Company 18
New Construction // Grafton, MA Size: 186,000 sf // Architect: SMMA Grafton High School
The new Grafton High School is located on the existing 46-acre high school site, so great care and planning took place to segregate the work site from the occupied campus. The new 186,000-square-foot Grafton High School serves 900 students and can accommodate up to 1,200. The school provides advanced educational spaces developed around a forward-thinking philosophy and a flexible cluster (pod) plan. These pods are designed and organized to reinforce the tenets of 21st-century career skills: collaboration, communication, creativity, critical thinking, and problem solving.
19 K-12
New Construction, Occupied Site // Newton, MA Size: 400,000 sf // Architect: Dore & Whittier Architects Newton North High School
Phase One of this MSBA-funded facility consisted of the construction of a two-story, academic/ athletic building and four-story interconnected classroom/academic wings. The building contains a theater, indoor swimming pool, an exhibition gymnasium, playing fields, and athletic support facilities; in addition, vocational educational spaces, such as automotive, carpentry, electrical, graphics/printing, and culinary arts facilities, were included, affording Newton’s students with a broad range of educational opportunities. Parking and vehicle circulation, site utilities, landscaping, and associated site improvements completed the scope requirements. The new school has been certified as a LEED Gold facility, the City’s first municipal building to be LEED certified.
Dimeo Construction Company 20
New Construction // Tolland, CT Size: 230,000 sf // Architect: Moser/Pilon/Nelson Tolland High School
The $46 million, 230,000 sf, 2-story senior high school houses 1,300 students and includes a 900 seat auditorium, cafeteria, gymnasium, and almost 60 classrooms, including music classrooms with special acoustical finishes, science classrooms, computer labs, specialty labs, and a new 10,000 sf library/media center. The school was built on a 45-acre parcel that required extensive site development for the school, roadways, parking, and multiple playing fields, including softball, baseball, track, football, soccer, practice fields, and tennis courts. This project was completed on schedule and slightly under budget.
21 K-12
New Construction // Madison, CT Size: 207,000 sf // Architect: JCJ Architecture. Daniel Hand High School
This 207,000 sf high school, constructed for the Town of Madison, CT, offers classrooms, administrative space, a media center, a gymnasium, and a cafeteria. The school consists of 2 separate buildings connected by an enclosed student commons bridge. The facility was constructed in brick masonry with precast accents and a glass third story. Additionally, the site features a bus drop-off area between the 2 buildings, separating student/ staff parking from parent/visitor drop-off areas.
Dimeo Construction Company 22
Addition // Providence, RI Size: 18,260 sf // Architect: Rhinebeck Architecture & Planning PC Moses Brown School
The Ross House is a 2-story, steel-framed structure with historical details to match the existing building. The new structure houses science, computer, and language classrooms. Site work for the addition encompassed utilities, including an emergency generator, transformer, fire protection, and domestic water, drainage, and sewer systems. Exposed aggregate walkways, new site lighting, and landscaping around the addition rounded out site improvements.
23 K-12
Renovations and Additions // Centerbook, CT Size: 55,000 sf // Architect: Arbonies King Vlock Essex Elementary School
The project involved renovations and an addition to an existing 76,000 sf, 50-year-old elementary school. Work included renovations to classrooms and administrative offices, as well as the creation of a new bus drop-off area and entrance on the east side of the building. The original project was modified to include a 14,000 sf eight-classroom addition after it was discovered that a septic issue would have driven up the cost of simply expanding the classrooms. The addition was built within the voter-approved budget and provided “swing space” into which students were moved during work on classrooms in other areas of the building.
Dimeo Construction Company 24
Our Services
Mitigating Risk Through Innovative Services
LEAN CONSTRUCTION MINIMIZING COSTS, MAXIMIZING VALUE
SAFETY & LOGISTICS SAFETY FIRST, SECOND AND LAST
Dimeo teams apply lean approaches to identify efficient work structuring through combining concurrent activities, utilizing just-in time (jit), prefabrication, and modular production strategies.
Dimeo’s Safety and Loss Control Program has been highly effective in maintaining safe and productive job sites, with extensive recognition and industry leadership.
VDC / BIM A MODEL FOR SUCCESS
QUALITY ASSURANCE / CONTROL MAINTAINING THE HIGHEST STANDARDS
Building Information Modeling (BIM) and Virtual Design and Construction (VDC) are powerful catalysts in supporting continuous collaboration among clients, designers, construction firms, manufacturers, and suppliers.
Dimeo professionals implement a proven QA/QC strategy from the point of inception of a project to achieve the intended quality standard specified.
PLANNING MEASURE TWICE, CUT ONCE
SUSTAINABILITY BUILDING FOR THE FUTURE
Dimeo has long been an industry leading participant in the effort to support and build sustainable buildings.
Dimeo’s preconstruction team focuses on engaging the owner and design team to ensure that project risks are planned for and that the best building investment value is realized.
SOURCING A WEALTH OF KNOWLEDGE & EXPERIENCE
COMMISSIONING CERTIFYING AT EVERY STAGE
Dimeo’s purchasing team serves as an independent resource to our project teams and clients throughout the scope, bid, subcontract award, GMP development process.
Dimeo views the period of substantial completion, commissioning & turnover as the real indicator of how well we perform our duties as your construction manager.
Dimeo Construction Company 26
Dimeo’s virtual design team is leading project teams through application of existing condition surveys, design coordination, prefabrication modularization, logistical planning and as-built documentation.
27 K-12
88 Black Falcon Avenue Suite 307 Boston, MA 02210 617.502.3080 1301 Atwood Avenue Suite 166 E Johnston, RI 02919 401.781.9800 700 State Street Suite 101 New Haven, CT 06511 203.777.5410 www.dimeo.com An Equal Opportunity Employer