Introduction to Dimeo

Quality Control/Commissioning/Turnover QAQC • Comprehensive plan parallelling requirements of construction documents and specifications • Review and inspection process for all submittals, samples, mockups, sub-QAQC, testing, and third party inspections

Communications and Documentation

Change Management • Document change order notifications with OPM • Utilize detailed evaluation, including unit pricing per subcontract agreement • Utilize subcontract wage and equipment rates and unit pricing • Conduct a thorough internal analysis of all change conditions, including scope confirmation and intent, costing, and time impacts • Negotiate all changes with subcontractors • Utilize formal change directive with OPM for time of essence work Team Reporting and Communications • Application of Procore and other cloud-based platforms with the entire team as primary source for all documentation • Procore hosts all drawings, meeting minutes, RFIs, shop drawing submittals/logs, QAAC, change management pricing/logs, photo documentation, daily reports, etc. • Primavera P6 software and Smartsheet used to produce construction project schedules • Predictive Solutions SafetyNet software tracks and issues abatement procedures for safety • REVIT and Navisworks /AutoCAD for building information modeling • Utilization of SmartScreen and Electronic Plan Room, as well as several other Autodesk programs • Monthly report stating cost, schedule, safety, and associated open items

Commissioning • Work with commissioning agent if designated - providing all necessary design/specs • Review and support confirmation of all pre functional checklists (PFC) • Final PFCs will be ensured by requiring the inclusion of requirements in MEP/FP contracts • Turnover comprehensive commissioning report confirming the operational performance of all building systems Turnover • Work with the design team and City officials in securing the final COO • Provide all attic stock and associated materials for building systems • Provide all as-built documentation (model) and all systems warranty information

OAC

• Weekly team meetings • Schedule review, long lead items • Submittal status and design changes

• Look ahead • Open items

Introduction to Dimeo 47

Made with FlippingBook flipbook maker