DIMEO Healthcare_Our People & Experience

Pfizer, Inc. VARIOUS LABORATORY PROJECTS

Groton and New London, CT

$12,707,483

CM/GMP or CM/Cost Plus

220,000 sf

Since 2002 Dimeo has completed various renovations and fit-ups on Pfizer’s Connecticut campuses in Groton and New London. Our first project, Building 260 renovations, included reconfiguring open space to create new offices and installation of new MEP systems. Subsequent projects have included: » B-288 Lactam Expansion Labs , which encompassed renovating existing vivarium and procedure spaces; showers; locker rooms; and lab areas for analytical, chemical and pharmaceutical lab research and development, including a product development cubical area. The mechanical systems required modifications and safety and filtering devices for the building air systems were installed. » B118E PSREL Facilities Upgrades , which involved relocation of the process safety and reactions engineering labs (PSREL), including extensive demolition of the existing space; revamping of the HVAC system including a roof top mounted HVAC unit; installation of resinous flooring, metal casework, fume hoods; and upgrades to the fire protections and fire alarm systems. » The Building 118C P5 Weighing and Sample Laboratory encompassed the renovation of an existing lab space and storage room to support an Isolator. The space required the MEP system to be reconfigured due to the negative air requirements of the Isolator equipment. Dimeo also constructed new walls and ceilings, as well as new finishes throughout the space. » The Building 118 Gen Pharma, Phases One & Two project consisted of the complete gut and renovation of existing laboratories. Phase Two involved complete interior lab renovation including HVAC components and lab casework. Additional projects have included expanding the Nuclear Magnetic Resonance (NMR) laboratory, KHTC Perimeter Security Upgrade, removal and replacement of an existing product freezer, PGRD Security System Upgrade, W115 LAT Relocation, consisting of interior lab renovation and relocation, 118 W Advanced Library Tech., Phases One & Two with renovation and modification of lab space, and the NLC1 Training Center Renovations.

SCHEDULE/COMPLETION DATE 6 Years, December 2008 OWNER REFERENCE Pfizer, Inc. Eastern Point Road Groton, CT 06340 Glen Fitzmorris, Dir of Project Engineering 860-441-4100 glen.m.fitzmorris@pfizer.com ARCHITECT REFERENCES Design Group One 860-526-6050 S/L/A/M 617-492-1800 / 860-657-8077 CUH2A 609-844-1212 Flad & Associates 203-323-9171 JCJ 860-247-9226 Saccoccio Associates 401-942-7970

DIMEO CONSTRUCTION COMPANY

Made with FlippingBook - Online Brochure Maker