DIMEO Healthcare_Our People & Experience

OFFICE AND RESEARCH FACILITY SCHEDULE/COMPLETION DATE 24 Months, June 2023 OWNER REFERENCE Winstanley Construction Management, LLC 300 George Street New Haven, CT 06511 Michael Tighe, Senior Project Manager 203.889.3271 (direct); 203.500.3191 (cell) mtighe@winent.com ARCHITECT REFERENCE Elkus Manfredi Architects BRIDGES SCHEDULE/COMPLETION DATE 21 Months, March 2023 OWNER REFERENCE Winstanley Construction Management, LLC 300 George Street New Haven, CT 06511 Carter Winstanley, President 203-624-5317 (office) cwinstanley@winent.com ARCHITECT REFERENCE Elkus Manfredi Architects 25 Drydock Avenue Boston, MA 02210 Peter Fourtounis, AIA, LEED AP BD+C Project Manager 617-368-3370 (office) 617-708-4041 (cell) pfourtounis@elkus-manfredi.com 25 Drydock Avenue Boston, MA 02210 David P. Manfredi, FAIA, LEED AP CEO & Founding Principal 617-426-1300 dmanfredi@elkus-manfredi.com

Winstanley Enterprises 101 COLLEGE STREET, OFFICE AND RESEARCH DEVELOPMENT

Office

New Haven, CT $168,449,876 CM/GMP

557,585 sf

Bridges

New Haven, CT $18,716,446

CM/GMP

4,369 sf

Dimeo Construction Company was recently awarded a new 557,585 sf twelve story office and life sciences research development facility located at 101 College Street in New Haven, CT. The building is designed by Elkus Manfredi Architects and in addition to the new building, will feature a parking area for 116 vehicles, loading docks at service drives, and site improvements, including a semi-public outdoor courtyard, sidewalks and streetscape improvements. The building will be constructed over the existing east and west-bound lanes of Route 34 which provide access to the parking garages and buildings to the west of the project. To allow continuous access during construction, the east bound lane will be taken out of service (with the west bound lane turned into two way traffic), so that the foundations and new tunnel can be built. Once in place, traffic will be transferred to the newly created east bound tunnel to allow the balance of foundations and construction of the west bound tunnel. After all the structural concrete is placed at the subterranean levels, the superstructure will commence with 10 stories of occupied space and 2 levels of mechanical equipment. The façade will be a combination of stick built curtainwall at the lower levels and a unitized system with glass and terracotta at the upper levels. Some ornamental metal panels highlight the entrances and building shadow lines. The curtainwall system was procured through a design assist process. 100 COLLEGE STREET BRIDGES North Bridge: 300 George Street to 100 College Street is 2,069 sf. South Bridge: T-Shaped Bridge connecting 3 buildings: Yale Buildings LEPH and SHM and 100 College Street is 2,300 sf.

DIMEO CONSTRUCTION COMPANY

Made with FlippingBook - Online Brochure Maker