Yale University STERLING TEACHING LABS OCCUPIED RENOVATION AND NEW CONSTRUCTION

New Haven, CT

$Confidential

CM/GMP

160,000 sf

The SCL project consisted of renovations/addition to a +/-90,000 sf facility. Scope included demolition and new construction of 75,000 sf of the building inclusive of new roof structure to enclose a lab and teaching spaces. The project provides for new Chemistry and Biology laboratories as well as Office, Lecturer and support. The project included over 220 fume hoods. The project required maintaining ongoing circulation to adjacent buildings and recreate space around the perimeter of the new construction. The new construction completed a total replacement of all structures from foundation throguh roof while maintaining historic buildings at the perimeter. Lean planning and building methods plus BIM were used for spatial coordination of MEP/FP systems to improve installation and reduce rework. Dimeo also leveraged BIM to aid in the evaluation and redesign of structure to support concrete lined ductwork, calculating point loads at critical points.

SCHEDULE/COMPLETION DATE 24 Months, June 2016 OWNER REFERENCE Yale University 2 Whitney Avenue New Haven, CT 06510 Sheri Miller Associate Director of Project Management & Construction 203-623-5267 sheri.miller@yale.edu ARCHITECT REFERENCE Cannon Design 99 Summer Street, Suite 600 Boston, MA 02110 Lynne Deninger, AIA, LEED AP, Principal 617-742-5440 ldeninger@cannondesign.com CERTIFICATION LEED Gold

DIMEO CONSTRUCTION COMPANY

Made with FlippingBook - Online Brochure Maker